siding

Back

real cedar siding
introduction

Back

siding home
why real cedar?
western red cedar characteristics
sustainability
design & spec

Back

siding profiles
bevel siding
board and batten siding
t&g siding
lap or channel siding
trim boards
shingle panels
building

Back

preparation for installation
pre-building tips
dupont™ tyvek® drainwrap™
installation
general installation
installing profiles
bevel
board & batten
tongue & groove
lap or channel
trim boards
shingle panels
finishing

Back

how to finish
types of finishes
care & maintenance
restoration
decking

Back

real cedar decking
introduction

Back

decking home
why real cedar?
western red cedar characteristics
sustainability
planning

Back

decking calculator
deck projects
roof deck
raised deck
ground level deck
uphill sloping lot deck
building

Back

fastener recommendations
stair & railing installation
finishing

Back

finishing tips
restoration
care & maintenance
outdoor

Back

real cedar outdoor
introduction

Back

outdoor home
why real cedar?
western red cedar characteristics
sustainability
design & spec

Back

real cedar free diy project plans
design tips
building

Back

project preparation
outdoor fasteners
fence construction
fence specifications
prebuilt fence panels
finishing

Back

finishing techniques
finishing tips
restoration tips
project care & maintenance
indoor

Back

western red cedar indoor
introduction

Back

indoor home
why real cedar?
western red cedar characteristics
sustainability
planning

Back

cedar saunas
traditional saunas
infrared cedar sauna
cedar indoor design tips
building products

Back

building preparation
indoor t&g paneling
doors & windows
blinds & shutters
finishing

Back

finishing tips
care & maintenance
timbers

Back

western red cedar timbers
introduction

Back

timbers home
why real cedar?
western red cedar characteristics
sustainability
planning

Back

grades and specifications
building

Back

preparation
installation
maintenance

Back

finishing
restoring western red cedar timbers
care & maintenance
gallery
resources
for architects and builders

New Zealand

Siding Preparation For Installation

Preparation and Installation Overview

Prime Before Installing

After cedar has achieved equilibrium moisture content and before it is installed, a coating on all surfaces is recommended. The type of coating will vary with final finish selected. The coating protects the wood from water penetration, helps prevent staining caused by mildew and extractives and can increase the service life of top coats. The following coatings have proven themselves in field testing (see table below).

Check with your paint dealer to make sure that the prefinish coat you select is compatible with the intended finish coat. For example, clear water repellants should not be used where the intended finish is a bleaching oil.

Recommended Priming Procedures for Cedar Siding

Type of Finish CoatRecommended Priming Coat
Natural and semi-transparent stainsCoat all surfaces with the stain
Solid color stains and paintsCoat all surfaces with an alkyd oil stain-blocking primer. Alternatively, use a clear water repellant on back of siding and the primer on face and edges
Bleaching OilsPrime all surfaces with a coat of the bleaching oil

Nails

Hot-dipped galvanized, aluminum and stainless steel nails are all corrosion-resistant and can be used to nail Western Red Cedar. Other types of nails are not recommended. They can rust and disintegrate and react adversely with the natural preservative oils present in cedar resulting in stains and streaks. Copper nails also react with cedar and should not be used. Stainless steel nails are the best choice, especially if the siding is to be finished with transparent stain. Use No.304 stainless for general siding applications and No.316 for seacoast exposures.

Type, Size and Spacing

For best results use “splitless” siding nails. These have thin shanks and blunt points to reduce splitting. For greater holding power, nails with ring threaded or spiral threaded shanks are recommended. Nails with textured heads can be used to reduce glossy spots at the nails when finishing (see figure on right for nail types).Fasteners for Buiding With Cedar

Nails should be driven with care. Heavy nailing distorts the wood and may cause splitting. At mitered corners, near edges and near ends, nail holes may need to be pre-drilled to avoid splitting.
The size of the nails to use depends on the type and thickness of siding. Good building practice is to use nails long enough to go through underlying materials, such as sheathing and insulation, and penetrate at least 1-1/4″ (32mm). See table below for recommended nail lengths for various thicknesses of siding.
Siding should be fastened to each stud or furring strip with nails spaced at a maximum of 24″ (61cm) on center, nail placement depends on the siding pattern and width. The key is to fasten the siding securely without preventing it from moving in response to the moisture content of the air. In general, each piece of siding must be nailed independently.

Important: Nailing overlapping pieces together restricts the natural movement of each piece and will cause splitting.

Minimum Recommended Nail Length

Siding TypeThickness (in.)Thickness (mm)Nail Size
Bevel1/2 or less13 mm or less2 (6d)
5/816 mm2 (6d)
3/419 mm2-1/4 (7d)
7/8 & greater22 mm or greater3 (10d)
Boards, Tongue & Groove, and Channel5/816 mm2 (6d)
3/419 mm2 (6d)
7/822 mm2-1/4 (7d)
Battens3/419 mm3 (10d)

Wall Construction

Like all siding materials, Western Red Cedar performs best when installed properly on a suitable frame. Cedar siding should be securely nailed to framing members, furring members or to blocking between framing members. Lumber sizes and spacing for blocking and furring are shown in the table below.

Stud Walls

Stud walls generally require no special preparation for horizontal siding installation. Siding should be nailed into studs at maximum 24″ (61cm) centers when applied over wood-based, solid sheathing and 16″ (41cm) on center when applied without sheathing. In those areas where an air space between siding and sheathing is desired, nail siding to furring strips.

For vertical siding installation, stud walls require horizontal blocking lines or furring strips. When applied over wood based sheathing, vertical siding should be nailed to horizontal blocking or other wood framing members not exceeding 36″ (91cm) on center when face nailed or 32″ (81cm) on center when blind nailed. When installed without sheathing, vertical siding should be nailed to wood framing or blocking members at 24″ (61mm) on center. Check your local code to verify requirements.

Masonry Walls

Masonry walls require furring strips for horizontal and vertical siding installation. Furring strips must be thick enough to allow for nail penetration of 1-1/2″ (38mm) into solid wood. Check your local code to verify requirements.

Lumber Size and Spacing for Blocking and Furring*

Minimum Lumber Size (in.)Minimum Lumber Size (mm)Maximum Center Spacing (in.)Maximum Center Spacing (cm)
Blocking2 x 251 x 512461
Furring over Sheathing1 x 225 x 512461
Furring over masonry walls2 x 251 x 512461

Rigid Foam Sheathing

Applying Siding Over Rigid Foam Sheathing

Rigid foam sheathing has an insulation value superior to that of traditional lumber and plywood sheathings. However, it has little or no nail holding power and using rigid foam sheathing as a nailing base for cedar siding is not recommended. For best results with rigid foam and other sheathing products, follow the nailing recommendations as to nail type, positioning, penetration and spacing. The table below provides nail length recommendations for siding and foam sheathing systems.

Rigid Foam SheathingFoam sheathing panels vary in moisture permeability but are generally considered as good moisture barriers. They should be used with a continuous film vapour retarder on the inside wall under the interior finish or with foil-backed gypsum board. Rigid foam sheathing can cause moisture to accumulate on the back of siding and cause staining, buckling and damage to finish coats. The following recommendations are meant to minimize potential problems when Cedar sidings are applied over rigid foam sheathing:

  • Use thicker siding patterns in widths of 8″ (203 mm) or less. Thick, narrow siding is more stable than thinner, wider patterns and better able to resist dimensional changes.
  • Use kiln-dried siding over rigid foam sheathing. This is the most stable cedar siding.
  • Proper prefinish is essential. Follow the priming recommendations given in this publication before installing siding.
  • Use light color finish coats to maximize heat reflection and reduce dimensional movement.
  • In severe climates, an air space between siding and rigid foam sheathing can be created by fastening furring strips to the sheathing before installing siding (see Wall Construction). Air spaces allow for the venting of accumulated moisture.
  • In all cases it is recommended that building paper or an equivalent building wrap be applied over the foam sheathing.

Recommended Minimum Nail Length for Siding Over Foam Sheathing

Siding and Sheathing ThicknessesNail Length
InchesMillimeters
1/2″ (13 mm) siding and 1/2″ (13 mm) foam sheathing2-1/457 mm
1/2″ (13 mm) siding and 3/4″ (19 mm) foam sheathing2-1/264 mm
1/2″ (13mm) siding and 1″ (25mm) foam sheathing376 mm
5/8″ (16mm) or 3/4″ (19mm) siding and 1/2″ (13mm) foam sheathing2-1/264 mm
5/8″ (16mm) or 3/4″ (19mm) siding and 1″ (25mm) foam sheathing376 mm

Moisture

Controlling Moisture

High humidity output from washers, dryers, showers, kitchens and other sources, combined with today’s energy-efficient construction, can result in a build up of interior moisture vapor. This vapor migrates through the fabric of a building from the warm interior to the cold exterior, and when it condenses to water can cause structural damage to sidings and finishes.

Vapor barriers installed on the warm side of the wall prevent most of the migration of moisture vapor but they have disadvantages. Residual vapor must be allowed to escape to the outside. Building paper installed on the outside face of the sheathing helps prevent rain and snow from penetrating the walls and also allows the escape of moisture vapor.

Proper wall construction includes the use of gas permeable paper and vapor barriers, such as DuPont™ Tyvek® DrainWrap™ (see diagram above). These are extremely effective in helping to prevent moisture problems. DuPont™ Tyvek® DrainWrap™ provides a building drainage system and weather barrier for areas that require maximum water drainage

Ground Clearance

Keep the lowest edge of siding at least 6″ off the ground and coat end grain at the bottom of vertical siding with water repellant.

Caulking

Thorough caulking of all joints is recommended including butt joints and where siding contacts openings or trim. Use only non-hardening caulks such as polyurethane, polysulfide or latex-silicone. Pure silicon caulks do not work well on cedar and are not recommended.

Do not reduce the siding overlap recommendations given in the installation sections of this publication. To do so could result in damage from wind-driven water.

Please note that the measurements displayed on this webpage are displayed in Imperial units. If metric is required, please perform the proper conversion as necessary.

Please note that the standards, grades and other information mentioned on this webpage are based on North American data. Please refer to your local resources or authorities for country-specific data relating to a particular country if required.

Why Western Red Cedar
Find out where to buy
Gallery